Partner · Orders · WO-4405
WO-4405.
LAX–PHX · 10G · Sunspire Resorts. Stage provisioning · 58% SLA runway.
← All work ordersAccount: Sunspire Resorts →
Stage ladder
design → loa → provisioning → testing → lit- designdonedone
- loadonedone
- provisioningactivecurrent70d 22hProperty backhaul build, diverse from primary.
- testingpendingpending
- litpendingpending
The per-stage clock ticks live for the active stage and freezes when prefers-reduced-motion is set. The SLA runway reflects the whole order against its turn-up target.
58% SLA runway
Validation suite
pre-handoff · simulated previewPre-handoff validationTesting stage has not started; validation is a no-op until LOA clears.
Layer 1: pre-handoff optics
0/0 pass- TX powerTransmit power within spec (-1 to +1 dBm).pending
- RX powerReceive power above the sensitivity floor.pending
- Loss of signalNo LOS alarms on either end.pending
Layer 2: transport stability
0/0 pass- Link stabilityNo interface flaps over the 30-minute window.pending
- FCS errorsFrame check sequence error rate under threshold.pending
Layer 3: RFC / protocol compliance
0/0 pass- BGP sessionBGP peering established and stable.pending
- Route propagationExpected prefixes learned on both ends.pending
Service: BERT / throughput / failover
0/0 pass- Latency SLARound-trip latency within the SLA target.pending
- ThroughputSustained throughput at the ordered rate.pending
- FailoverPath failover under primary loss.pending
simThe partner preview simulates the provider's pre-handoff run for visibility. The authoritative validation is a provider action; this write lives in this browser session only.
Provisioning feed
newest at bottom · no auto-scroll- Jul 24, 08:30ZprovisioningProperty backhaul build started (diverse from primary).
The feed announces new events politely to assistive tech without scrolling the page.