Partner

Partner · Orders · WO-4405

WO-4405.

LAX–PHX · 10G · Sunspire Resorts. Stage provisioning · 58% SLA runway.

← All work ordersAccount: Sunspire Resorts →

Stage ladder

design → loa → provisioning → testing → lit
  1. designdonedone
  2. loadonedone
  3. provisioningactivecurrent70d 22hProperty backhaul build, diverse from primary.
  4. testingpendingpending
  5. litpendingpending

The per-stage clock ticks live for the active stage and freezes when prefers-reduced-motion is set. The SLA runway reflects the whole order against its turn-up target.

58% SLA runway

Validation suite

pre-handoff · simulated preview
Pre-handoff validationTesting stage has not started; validation is a no-op until LOA clears.

Layer 1: pre-handoff optics

0/0 pass
  • TX powerTransmit power within spec (-1 to +1 dBm).pending
  • RX powerReceive power above the sensitivity floor.pending
  • Loss of signalNo LOS alarms on either end.pending

Layer 2: transport stability

0/0 pass
  • Link stabilityNo interface flaps over the 30-minute window.pending
  • FCS errorsFrame check sequence error rate under threshold.pending

Layer 3: RFC / protocol compliance

0/0 pass
  • BGP sessionBGP peering established and stable.pending
  • Route propagationExpected prefixes learned on both ends.pending

Service: BERT / throughput / failover

0/0 pass
  • Latency SLARound-trip latency within the SLA target.pending
  • ThroughputSustained throughput at the ordered rate.pending
  • FailoverPath failover under primary loss.pending

simThe partner preview simulates the provider's pre-handoff run for visibility. The authoritative validation is a provider action; this write lives in this browser session only.

Provisioning feed

newest at bottom · no auto-scroll
  1. Jul 24, 08:30ZprovisioningProperty backhaul build started (diverse from primary).

The feed announces new events politely to assistive tech without scrolling the page.