Stage ladder

design → loa → provisioning → testing → lit
  1. designdonedone
  2. loadonedoneLOA countersigned by facility.
  3. provisioningdonedone
  4. testingdone1d 2hAll acceptance checks passed.
  5. litactivecurrentlit since Jul 20, 10:30ZTurned up and handed to operations.

The per-stage clock ticks live for the active stage and freezes when prefers-reduced-motion is set. The SLA runway below reflects the whole order against its turn-up target.

100% SLA runway

Validation suite

pre-handoff · simulated
Pre-handoff validation

Layer 1: pre-handoff optics

3/3 pass
  • TX powerTransmit power within spec (-1 to +1 dBm).0.1 dBmpass
  • RX powerReceive power above the sensitivity floor.-3.1 dBmpass
  • Loss of signalNo LOS alarms on either end.pass

Layer 2: transport stability

2/2 pass
  • Link stabilityNo interface flaps over the 30-minute window.pass
  • FCS errorsFrame check sequence error rate under threshold.0 errpass

Layer 3: RFC / protocol compliance

2/2 pass
  • BGP sessionBGP peering established and stable.pass
  • Route propagationExpected prefixes learned on both ends.132 prefixespass

Service: BERT / throughput / failover

3/3 pass
  • Latency SLARound-trip latency within the SLA target.3.8 mspass
  • ThroughputSustained throughput at the ordered rate.10.0 Gbpspass
  • FailoverPath failover under primary loss.pass

Configuration diff: delivered vs ordered

simulated · preview

Configuration diff between delivered and ordered interface config.5 line(s) added, 1 line(s) removed.


              interface et-0/0/0 {  description "MIA-PHX backhaul";  mtu 9192;
                      Added: 
                        unit 0 {
                    
                      Added: 
                          family inet {
                    
                      Added: 
                            address 10.50.12.1/31;
                    
                      Added: 
                          }
                    
                      Added: 
                        }
                    
                      Removed: 
                        mtu 9000;
                      enable;}
            

Provisioning feed

newest at bottom · no auto-scroll
  1. Jul 19, 08:00ZtestingAcceptance test suite started.
  2. Jul 20, 10:00ZtestingAll acceptance checks passed.
  3. Jul 20, 10:30ZlitService turned up and handed to operations.

The feed announces new events politely to assistive tech without scrolling the page. The per-stage clock above ticks live and freezes under prefers-reduced-motion.