Provider

Provider · Orders · WO-4401

WO-4401.

AMS–FRA · 40G · Lumen Bay Power. Stage testing · 92% SLA runway.

← All work orders

Stage ladder

design → loa → provisioning → testing → lit
  1. designdone1d 8h
  2. loadone2d 3hLOA countersigned by facility.
  3. provisioningdone5d 8h
  4. testingactivecurrent69d 22hAcceptance tests running; one check pending turn-up.
  5. litpendingpending

The per-stage clock ticks live for the active stage and freezes when prefers-reduced-motion is set. The SLA runway below reflects the whole order against its turn-up target.

92% SLA runway

Validation suite

pre-handoff · simulated
Pre-handoff validation

Layer 1: pre-handoff optics

3/3 pass
  • TX powerTransmit power within spec (-1 to +1 dBm).0.2 dBmpass
  • RX powerReceive power above the sensitivity floor.-3.4 dBmpass
  • Loss of signalNo LOS alarms on either end.pass

Layer 2: transport stability

2/2 pass
  • Link stabilityNo interface flaps over the 30-minute window.pass
  • FCS errorsFrame check sequence error rate under threshold.0 errpass

Layer 3: RFC / protocol compliance

2/2 pass
  • BGP sessionBGP peering established and stable.pass
  • Route propagationExpected prefixes learned on both ends.128 prefixespass

Service: BERT / throughput / failover

2/3 pass · 1 pending
  • Latency SLARound-trip latency within the SLA target.4.1 mspass
  • ThroughputSustained throughput at the ordered rate.39.8 Gbpspass
  • FailoverPath failover under primary loss.Failover validation scheduled at the turn-up window.pending

Configuration diff: delivered vs ordered

simulated · preview

Configuration diff between delivered and ordered interface config.5 line(s) added, 1 line(s) removed.


              interface et-0/0/0 {  description "MIA-PHX backhaul";  mtu 9192;
                      Added: 
                        unit 0 {
                    
                      Added: 
                          family inet {
                    
                      Added: 
                            address 10.50.12.1/31;
                    
                      Added: 
                          }
                    
                      Added: 
                        }
                    
                      Removed: 
                        mtu 9000;
                      enable;}
            

Provisioning feed

newest at bottom · no auto-scroll
  1. Jul 25, 08:00ZtestingAcceptance test suite started.
  2. Jul 25, 09:10ZtestingLayer 1 optics: PASS (TX/RX within spec).
  3. Jul 25, 10:30ZtestingLatency 4.1 ms, throughput 39.8 Gbps: PASS.
  4. Jul 25, 10:31ZtestingFailover validation pending the turn-up window.

The feed announces new events politely to assistive tech without scrolling the page. The per-stage clock above ticks live and freezes under prefers-reduced-motion.