Provider · Orders · WO-4408
WO-4408.
FRA–LON · 100G · Quayside Bank. Stage provisioning · 49% SLA runway.
Stage ladder
design → loa → provisioning → testing → lit- designdonedone
- loadonedone
- provisioningactivecurrent76d 19hCross-connect build in progress.
- testingpendingpending
- litpendingpending
The per-stage clock ticks live for the active stage and freezes when prefers-reduced-motion is set. The SLA runway below reflects the whole order against its turn-up target.
49% SLA runway
Validation suite
pre-handoff · simulatedPre-handoff validationTesting stage has not started; validation is a no-op until LOA clears.
Layer 1: pre-handoff optics
0/0 pass- TX powerTransmit power within spec (-1 to +1 dBm).pending
- RX powerReceive power above the sensitivity floor.pending
- Loss of signalNo LOS alarms on either end.pending
Layer 2: transport stability
0/0 pass- Link stabilityNo interface flaps over the 30-minute window.pending
- FCS errorsFrame check sequence error rate under threshold.pending
Layer 3: RFC / protocol compliance
0/0 pass- BGP sessionBGP peering established and stable.pending
- Route propagationExpected prefixes learned on both ends.pending
Service: BERT / throughput / failover
0/0 pass- Latency SLARound-trip latency within the SLA target.pending
- ThroughputSustained throughput at the ordered rate.pending
- FailoverPath failover under primary loss.pending
Configuration diff: delivered vs ordered
simulated · previewConfiguration diff between delivered and ordered interface config.5 line(s) added, 1 line(s) removed.
interface et-0/0/0 { description "MIA-PHX backhaul"; mtu 9192;
Added:
unit 0 {
Added:
family inet {
Added:
address 10.50.12.1/31;
Added:
}
Added:
}
Removed:
mtu 9000;
enable;}
Provisioning feed
newest at bottom · no auto-scroll- Jul 18, 11:30ZprovisioningCross-connect build started.
The feed announces new events politely to assistive tech without scrolling the page. The per-stage clock above ticks live and freezes under prefers-reduced-motion.