Dispatch.

The field board. Every open work order, its priority and SLA window, and the technician carrying it. Below it, the OTDR reader turns an instrument distance into the exact spot a crew has to dig.

Open3of 3 work orders
P11restore now
P21investigate
P31planned
On site1techs working
Dispatched1techs rolling
OTDR pins1faults geolocated

Work orders

ordered by priority
  • P1

    Platte Valley conduit -- fibre restore

    repairing

    Backhoe dig-in near mile 380; east 400G channel down, west 400G degraded.

    Work order
    wo-fc1-1
    Cable
    fc-1
    SLA window
    13h
    Splice case
    sc-fc1-12
    Rosa MoralesVAN-14
    • fusion-splice
    • otdr
    • high-voltage-bonding
  • P2

    Sonoran conduit -- congestion investigation

    en route

    Link at 94% utilisation; no hard fault. Investigate amplification headroom and a possible shunt.

    Work order
    wo-fc2-1
    Cable
    fc-2
    SLA window
    33h
    Daniel OkaforVAN-09
    • otdr
    • fiber-characterization
    • traffic-shift
  • P3

    Planned splice maintenance -- buffer 4

    scheduled

    Scheduled replacement of two aging splice cases during the maintenance window.

    Work order
    wo-fc3-1
    Cable
    fc-3
    SLA window
    30h
    Splice case
    sc-fc3-04
    unassigned
    • fusion-splice
    • conduit
    • as-built-survey

Technicians

roster · 3
Technician roster with status, vehicle, and competencies
TechnicianStatusVehicleCompetenciesGPS
Rosa Moraleson siteVAN-14fusion-splice, otdr, roadm, high-voltage-bonding39.324, -98.233
Daniel OkafordispatchedVAN-09otdr, conduit, fiber-characterization, traffic-shift39.0997, -94.5786
Jin ParkavailableVAN-22fusion-splice, conduit, as-built-survey41.8781, -87.6298

OTDR geolocation

distance to dig location

An OTDR pulse locates a fault by distance along the fibre. Slack loops coiled at poles inflate that reading; subtracting them and interpolating along the cable route drops a pin exactly where a crew must dig.

OTDR pins resolved to GPS for each traced work order
Work orderOTDRSlackMap distFractionDig location
wo-fc1-1610.3 km−18.3 km592 km65%39.32409, -98.23183

Trace it live

Drag the OTDR distance and watch the slack correction, the map distance, and the dig pin update step by step.

Backhoe dig-in near mile 380; east 400G channel down, west 400G degraded.

Resolving cable geometry…